Home Renovation Project: Vault Removal: The Final Details
We have been working hard for the past few evenings putting the final
touches on the rooms affected by the vault removal project. I have
finished repainting all of the doors and they are now all rehung. The
black light plates are now installed as well as the newly repainted
black security system wall console and the whiteboard (which now has a
newly repainted black frame). I
repainted the mudroom walls (yellow) and then Kristy applied the brown
sponged faux finish over the
top of it to match the kitchen. I then put a top sealer coat on the
mudroom walls to
protect them from little hands. I also put a top coat on the faux
finish Kristy did in the bathroom. Tedious work... but it had to be
done.
We are now just missing a few final details. In the living room I need
to install this high-load X10 switch I bought to control the new
Christmas tree lighting circuit. It's not a high priority item, but it
needs to be done before Thanksgiving at least.
The kitchen island lacks
the drawer front for the drawer below the microwave, some trim around the
island legs, and new kitchen stools (on order). Our window sill still
needs to be replaced with either some solid surface marble (to match the
existing granite), or if that isn't possible... some black painted trim.
The kitchen also needs a top coat sealer of the faux finish.
The mudroom is missing drawer fronts on the drawers and the false front
on the sink cabinet. I need to rehang the key holder on the wall
next to the door. I ordered some cool under-cabinet lighting to install
above the sink. The hooks are now installed in the lockers, but the
locker bench cushion needs to be ordered.
The bathroom countertop isn't done and we haven't heard from Jason the
tile guy about starting new work. We'll probably have to locate another
subcontractor. One that work is done, all of the bathroom tile will
need to be cleaned and sealed. There are also three drawer faces that
are not yet installed.
Eliana's bedroom is done. The bedroom shutters have been ordered and
the install is scheduled for August 8th.
Kristy's office is almost there. The office also lacks shutters
(installation is also scheduled for August 8th). The ceiling needs some
mud to level it out (and will then need to be repainted). I have spoken
with the drywall subcontractor about it (and one of the proprietors has
been out to look at the work), but I haven't heard any word since then.
Kristy's desk latching mechanism also needs to be dressed up.
So, here is the new punch list:
-
living room: install X10 switch (Rus)
-
kitchen: drawer front (cabinet subcontractor)
-
kitchen: island leg trim (cabinet subcontractor)
-
kitchen: window sill marble (Kristy)
-
kitchen: kitchen stools (Kristy)
- kitchen: apply faux finish seal (Rus)
-
mudroom: drawer fronts (cabinet subcontractor)
-
mudroom: hang key holder (Rus)
- mudroom: sink lighting (Rus)
-
mudroom: locker bench cushion (Kristy)
-
bathroom: drawer fronts (cabinet subcontractor)
- bathroom: laundry countertop (tile subcontractor)
- bathroom: clean and seal stone (Rus)
-
bedroom: shutter install (shutter subcontractor)
-
office: ceiling needs leveling (drywall subcontractor)
- office: repaint ceiling (Rus)
- office: desk details (cabinet subcontractor)
-
office: shutter install (shutter subcontractor)
The goal is to have all this done by the end of July. Hopefully by
then, only the shutter install will remain.
|